Estimated Project Cost: $2,000,000
Project Description


The project included the upgrade of pneumatic and mechanical controls to a Programmable Logic Controller (PLC) based automated system. The automated level and transfer system was implemented for contamination prevention, overflow prevention and real-time inventory of bulk liquid. The project was a retrofit job with no production interruptions.


Picture of material transfer PLC panel




Scope of Work

 

 

 



Engineering Services

 

 

















 