HOT OIL SKIDS
Estimated Project Cost: $700,000
The project involved the design, installation and startup of four (4) Skid Mounted Hot Oil Systems in an existing chemical production facility. The old system was no longer capable of supplying the demands placed upon it by increases in production. A new solution was devised to achieve an optimal operating scenario. It was decided that multiple heating units had a significant cost saving advantage and by making them modular, fabrication could take place offsite to minimize down time.
- Four (4) Hot Oil (650°F) Skids with Heat Exhanger, Pump and Control
Valves
- Interface with Existing Hot Oil Distribution System
- Interface with Existing Process Reactors Heating/Cooling Piping Systems
- Instrumentation and Controls Upgrade
- Construction Sequencing
- Conceptual Design and Cost Estimate
- Preliminary Design and Cost Estimate
- Detailed Design and Specifications
- Equipment/Instrument Procurement
- Bid and Bid Evaluations
- Fabrication/Installation Management
- Checkout, Startup and Commissioning
- Standard Operating Procedures
- Project Cost Control