HOT OIL SKIDS
Estimated Project Cost: $700,000
The hot oil skids project involved the design, installation
and startup of four (4) Skid Mounted Hot Oil Systems in an existing chemical
production facility. The old system was no longer capable of supplying the
demands placed upon it by increases in production. A new solution was devised
to achieve an optimal operating scenario. It was decided that multiple heating
units had a significant cost saving advantage and by making them modular,
fabrication could take place offsite to minimize down time.
- Four (4) Hot Oil (650°F) Skids with Heat Exhanger, Pump and Control
Valves
- Interface with Existing Hot Oil Distribution System
- Interface with Existing Process Reactors Heating/Cooling Piping Systems
- Instrumentation and Controls Upgrade
- Construction Sequencing
- Conceptual Design and Cost Estimate
- Preliminary Design and Cost Estimate
- Detailed Design and Specifications
- Equipment/Instrument Procurement
- Bid and Bid Evaluations
- Fabrication/Installation Management
- Checkout, Startup and Commissioning
- Standard Operating Procedures
- Project Cost Control