Estimated Project Cost: $150,000

Project Description

 

The Data Center AC Upgrade project involved the planning, design, installation and startup of two new Computer Room Air Conditioning (CRAC) units to the existing Data Center at the University of Michigan. These additional CRAC units were required to ensure that the data center space temperature could be maintained at the desired set point. This project also involved connecting these new AC units to the emergency power source.
Picture of AC unit for Data Center at UM building






Scope of Work

 

 

Engineering Services


 

Picture of emergency power to new CRAC units

 





 