CUSTOMER TECHNOLOGY CENTER
Estimated Project Cost: Total: $11,000,000 Mechanical: $2,200,000
Project Description
The overall project included the building of a new $11 million, three story, 103,500 square foot Customer Technology Center (CTC) facility. This new facility included an auditorium, laboratories, large open office spaces, individual offices and multiple conference rooms on each floor.
Scope of Work
Process Results' involvement included the design of the mechanical systems for this facility. This included plumbing, fire protection, heating, ventilation and air conditioning for the facility's auditorium. The mechanical systems for this facility had a total estimated cost of $2.2 million.
Engineering Services
- Design of Plumbing Utilities
- Design of Fire Protection Systems
- Design of Heating, Ventilation and Air Conditioning (HVAC)
- Specialty Exhaust Design and Equipment Selection
- Design of Direct Digital Controls (DDC)
- Review of Boiler and Chiller Logs
- Designed Piping for Heating and Chilled Water for Future Six-Story Office Building