CMP PLANT EXPANSION
Estimated Project Cost: $800,000
Project Description
The CMP Plant Expansion project involved the planning,
design, installation, startup and project management of a plant expansion.
This expansion increased production and drumming of semi-conductor cleaning
slurry used in the electronic industry. The project also included new mix
tanks, filtration systems and drumming station. The design incorporated the
owner's requirements of specific material usage and semi-conductor manufacturer's
strict requirements to minimize validation.
Scope of Work
- Mixing
- Multi-Stage Filtration
- Scaled Drumming Station
- Stagnant Product Purging
- Deionized Water System
- Chiller System Upgrade
- Access Platforms
- Building Modifications
Engineering
Services
- Preliminary Design an d Cost Estimate
- Detailed Design
- Equipment and Instrument Specifications
- Equipment, Instrument and Piping Procurement
- Bid and Bid Evaluations
- Project Scheduling and Updates
- Programming
- Checkout, Startup and Commissioning
- Project Cost Control
- Record Documentation