Chiller Plant Lifecycle Cost Assessment

Engineering services specialties of Process Results Engineering markets commonly served by Process Results Ptocess Results engineering experience Process Resilts company links Process Results header image


 

CHILLER PLANT LIFECYCLE
COST ASSESSMENT
Lifecycle Study Cost: $10,000

Project Description

 

The project involved evaluating a proposed central chiller plant at the University of Michigan North Campus. The lifecycle cost of the 4,000-ton central chiller plant was compared to the cost of distributed, stand-alone chiller installations located in individual buildings. The comparison considered installed, maintenance and operating costs, construction of new buildings, and future load growth in existing buildings. This task required the application of lifecycle metrics, equipment efficiency parameters, and operating profiles to generate a complete cash flow analysis of the two alternatives.
Picture of chiller plant at UM North Campus building






Scope of Work

 

 

Engineering Services


Picture of chiller at UM North Campus building

 

 





 

Click here to open our "Ask an Engineer" form
"Ask an Engineer"
Click here to open our newsletter signup form
PRI Vision Newsletter Signup